It snowed 9” last night the powder was half way to our knees. The skiing was a lot harder. The temperature was in the 32’s instead of the high 50’s. At 3pm went to Rockaway to catch the Durango train. The snow was perfect the sun had come out and the shy had puffy white clouds. As we waited for the train the men from the meeting were throwing snow balls at each other. The train arrived about 3:40 everybody loaded up and we started through the gorge. After about 10 minutes the train came to a jerky stop. We had left one of the bus’s at the station. They had seen the train go through the pass. We ere later told that this had been the first time in the trains history that it had backed up after leaving Rockaway.
The train ride was about 3 hours long. At the half way point the train turned around at a Y. The ride alone the river was spectacular.
After the train ride we went to the Durango train Museum and had our supper. It was good.
This is were we started backing up.
Camera phone image.
Wednesday, March 08, 2006
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment